OBIEE DAC Full load & Incremental load ETL duration Focus Areas for Improved Performance:
1: Change Capture Takes More Time in ETL Process in OBIEE DAC for Siebel Marketing
2: Composite Key for Fact Table ( all foreign keys of the Fact Table)
3: Drop and Create Indexes Manually After DB Migration
4: High Waterfall Mark issues to be addressed in the Database Objects
5: Database Volume on OLAP Database
6: Maximum Sessions parameter value in DAC to Determining the Informatica Server Maximum Sessions Parameter Setting
7: maximum number of work flows that can be executed in parallel on the Informatica server.
8: Drop Unsed Objects and compile the invalid objects in the Database
9: Disable Jobs / Tasks that re not part of the execution Plan of the Current ETL.
10: use union or union all in the SQL Qualifier instead of 'OR', Remove Duplicates from Staging Table.
11: Bulk Loading in Informatica.
Thanks
BSK
Siebel Anlaytics (7.5.2 ) -> OBI 12c, Tableau 9.1.2 Administration, Pentaho BA 6.0, Denodo 5.5, Amazon Redshift and PostgreSQL.
Thursday, September 4, 2008
Subscribe to:
Posts (Atom)
Technical Links
Blog Archive
-
►
2016
(2)
- ► 07/31 - 08/07 (1)
- ► 02/28 - 03/06 (1)
-
►
2015
(6)
- ► 11/29 - 12/06 (2)
- ► 11/01 - 11/08 (1)
- ► 09/06 - 09/13 (1)
- ► 03/15 - 03/22 (2)
-
►
2013
(5)
- ► 10/27 - 11/03 (1)
- ► 04/07 - 04/14 (1)
- ► 03/31 - 04/07 (3)
-
▼
2008
(15)
- ► 09/21 - 09/28 (1)
- ► 09/07 - 09/14 (2)
- ► 08/24 - 08/31 (3)
- ► 08/17 - 08/24 (3)
- ► 08/10 - 08/17 (2)
- ► 05/25 - 06/01 (1)
- ► 03/30 - 04/06 (2)